The construction principle of concrete pump machine should not be messed up

concrete pump machines are used in various construction projects, and the use effect is recognized by the majority of users. If you want to have a good construction effect of the concrete pump machine, you must have good construction technology. Let’s introduce the construction principles of the concrete pump machine, hoping to help you.

concrete pump machine construction principle

1. Be clear about the construction sequence of the concrete pump machine. When using the pump pipe to transport concrete, it should be poured from far to near; the concrete in the same area should be poured continuously in layers in the order of vertical structure first and then horizontal structure.
2, grasp the interval time. In the case where construction joints are not allowed, the intermittent time of concrete pouring between areas and between the upper and lower floors shall not exceed the initial setting time of concrete; prescribed treatment.
3. Divide the construction area. The concrete pouring area should be pre-divided according to the characteristics of the project structure, the plane shape and geometric size, the capacity of the concrete supply and pumping equipment, the labor and management capacity, and the size of the surrounding site.
4. Pipeline layout is very important. When arranging the pipeline, it should be carried out according to the short distance and few elbows, so as to reduce the transmission resistance as much as possible, thereby reducing the possibility of blocking the pipeline.
The above is an introduction to the construction principles of concrete pump machines. You can refer to it. For more details, continue to pay attention to our website.